CALL:
703-656-1445

Third View of H-Piling Finish

Third View of H-Piling Finish

By Tim Lysett


This view “inside” the “H” shows the beam’s smooth surface. Cor-Tuf hardens within two to three hours and can be handled in eight hours following a pour. Half-strength is produced in five to seven days; full curing is obtained in 28 days. Additional strength can be achieved with increased temperature, steam, or both during curing.

Add a Comment

Your email address will not be published. Required fields are marked *