Here we have switched hammers to the larger D62 hammer for phase two of our installation testing. In phase two, we were attempting to break the piling by applying as much vertical force as possible to the top of the pile.
Ready-Mix UHPC – the New Normal
Are you ready for nationwide adoption of Ultra High-Performance Concrete (UHPC)? We’re at an inflection point in the concrete construction industry. Engineers, contractors, and regulators