High Strength Concrete Piling Install

Phase Two of Cor-Tuf UHPC Installation Testing

By Tim Lysett


Here we have switched hammers to the larger D62 hammer for phase two of our installation testing. In phase two, we were attempting to break the piling by applying as much vertical force as possible to the top of the pile.